Beckhoff PT100 Manual de usuario Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 10
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
PT100 4-fold temperature measurement Beckhoff II/O System
Date : 12 March 97 Version : 1.1 Page 5 of 10
2. Software functional description
Timing diagram:
Explanation of the timing diagram:
Signal assignment to II/O message data bytes:
Reset: D2.7
Select1 (priority 1): D2.0
Select2 (priority 2): D2.1
Select4 (priority 3): D2.2
Valid: D2.3
Data: D0.0 to D0.7
D1.0 to D1.7
The restart signal is used to reset the processor to the PT100 module. The signal remains at
"1" for continuous operation.
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10

Comentarios a estos manuales

Sin comentarios