Installation and Operating instructions for C9900-U330-0010 battery pack Version: 1.8 Date: 2015-02-17
Troubleshooting Troubleshooting In the event of a fault contact your Beckhoff Service. Service and Support Beckhoff and their partners around
Assembly dimensions Assembly dimensions Maximum device dimensions in mm. C9900-U330-0010 battery pack Wiring diagram C9900-U330-0010 9
Appendix 10 C9900-U330-0010 Appendix Technical data Electrical data Nominal voltage: 24 V Capacity: 3.4 Ah (discharge over 20 hours) Internal r
Table of contents Table of contents 1. 2. 3. 4. 5. 6. 7. General Notes 2 Notes on the documentation 2 Liability Conditions 2 Description of safe
General Notes General Notes Notes on the documentation This description is only intended for the use of trained specialists in control and autom
General Notes Basic safety measures i Note The battery pack must only be used in conjunction with the C9900-P209, C9900-P214, C9900-P216 or C99
Installation Instructions Installation Instructions Appropriate Use The C9900-U330-0010 battery pack is designed for installation in machine and
Installation Instructions Connecting the battery pack Connection with the Industrial PC The 5-pin 2-wire terminal strip with mounting flanges
Installation Instructions Connector installation Fitting the connector to the cable The plug is fitted to the cable as follows: 1. Remove the i
Operating Instructions Operating Instructions Appropriate Use The C9900-U330-0010 battery pack is designed for installation in machine and plant
Comentarios a estos manuales